blasting 10

Operating cost elements – wheel and airblast systems

  • Primary heads – Wheelblast
  • Electricity (total connected load x cost of power)
  • Media consumption / replenishment (total media flow x breakdown rate)
  • Cost of wheel parts – wheel parts
  • Cabinet and other component wear – liners, bearings, elevator belt & buckets, dust collector cartridges etc.
  • Wear on work handling arrangement components – table, rollers, belts etc.
  • Primary heads – Airblast
  • Electricity (total connected load x cost of power) – to operate compressor
  • Media consumption / replenishment (total media flow x breakdown rate)
  • Cost of wear parts – nozzle, hoses, tank valves etc.
  • Cabinet and other component wear – liners, bearings, elevator belt & buckets, dust collector cartridges etc.
  • Wear on work handling arrangement components – table, rollers, belts etc.
0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *